国家

全局标志图标
全球
阿尔巴尼亚国旗图标
阿尔巴尼亚
巴西国旗图标
巴西
智利国旗图标
智利
克罗地亚国旗图标
克罗地亚
芬兰国旗图标
芬兰
法国国旗图标
法国
德国国旗图标
德国
印度国旗图标
印度
爱尔兰国旗图标
爱尔兰
意大利国旗图标
意大利
尼泊尔国旗图标
尼泊尔
荷兰国旗图标
荷兰
挪威国旗图标
挪威
秘鲁国旗图标
秘鲁
波兰国旗图标
波兰
葡萄牙国旗图标
葡萄牙
西班牙国旗图标
西班牙
瑞典国旗图标
瑞典
rkiye国旗图标
Turkiye
联合王国 flag icon
联合王国
美国 flag icon
美国

智利

Statkraft has been present in 智利 since 2014, operating two hydropower plants and developing hydropower and wind projects.

The two hydro power plants La Confluencia and La Higuera are located in the central area of the country and are operated through a joint venture with the Australian company Pacific Hydro.

In 2015, we acquired Compañía Pilmaiquen Electric with projects and operations in the Pilmaiquen River basin, on the border of the Los Lagos and Los Ríos regions, 在智利南部. Statkraft operates the Rucatayo run-of-river power plant and is currently also constructing the Los Lagos hydropower project.

The Osorno project is not under construction. Statkraft 智利 publicly announced its withdrawal from the Osorno project in January 2023, and in September of the same year, the 环境al Assessment Service (SEA) of 智利 confirmed the company's resignation, which implies that the project will not be able to be executed. In addition to the resignation, Statkraft 智利 restored the water rights associated with the project to the State of 智利.

We are promoting the development of 风力发电 in 智利 with the development of three wind farms accounting for more than 100 MW in the central area of the country. The operation of the three wind farms will contribute to a reduction of 100,000 tons of CO2 每年.

水电站
智利
照片:十大最好的网赌平台

The Rucatayo run-of-river power plant.

关键的事实

  • Three hydropower plants in operation 
  • 263 MW installed capacity 
  • One hydropower project under construction with an installed capacity of 52 MW 
  • Three wind projects with installed capacity of 110 MW 

阅读更多 on the 智利 country site

Opens in new tab or window
智利 country office - Santiago
Statkraft 智利 Inversiones Eléctricas Ltda.
Address

Av. Vitacura 2969, 7th Floor

Edificio Torre Alto El Golf

CP 7550007, Las Condes, Santiago

相关文章

  • Statkraft acquires 风力发电 projects in 智利

    Statkraft has recently acquired three 风力发电 projects in 智利 with a planned installed capacity of 110 MW in total. The acquisition gives Statkraft an opportunity to take advantage of the great 风力发电 potential in the area and grow its renewable energy portfolio in 智利.

    阅读更多

  • Statkraft to build Los Lagos hydropower plant in 智利

    Statkraft has decided to start construction of the Los Lagos hydropower plant in 智利. The construction is planned to commence in August and completion is scheduled for second half of 2022. The power plant will have an installed capacity of 52 MW and an annual production of 260 GWh.

    阅读更多

Find out more about our activities in 智利